Re-Stripe a Parking Lot
Project Scenario
Charlotte owns an apartment complex. The lines for the parking stalls, at her apartment complex, are fading away. How does she re-paint them?
Preparation
- Review local zoning laws for handicap and fire zone clearances and distances.
- Moss and mildew should be treated with a recommended cleaner.
- Pressure wash to remove dirt and other contaminants. Let dry thoroughly; At least 24 hours.
- Immediately prior to striping, use a landscape blower to remove loose impediments.
Primer Coat
No primer needed. Rodda Paint's Zone Marking Paint is self-priming
Top Coat
Zone Marking paint is determined by the type of surface you are painting.
Caution! Things to consider
- Allow for off site parking for 24 hours while application occurs
- Weather must be dry 24 hours prior to painting.
- Zone marking paint is dry to touch in 30 minutes.
- Safe to drive over stripe after 1 hour at 50°F
- Avoid rainfall for 4 hours at 50°F after re-striping
- Line stripers can be difficult to locate at rental yards. We do see them for multiple application uses. Plywood guides and a 3 inch or 4 inch roller cover are very efficient.
- Stencils for letters, numbers, and symbols are available online throught Titan.
- We also sell 7341 Driveline Striping Paint.